Project Type( Irrigation and Drainage )

Project CodeStart and Complete DateProject NameClientLocationProject CostFeeServicesFurther DetailsGallery
14 8/1/2014 9/1/2016 Khyber Pakhtunkhwa Water Resources Sector Project (TA 8488 PAK) Updating Feasibility Studies of (a) Pehur High Level Canal Extension Project (b) Chapra Dam Project (c)Chamak Mira Dam Project Asian Development Bank KPK, Pakistan US$ 250 Million US$ 687,400
  • Feasibility Study
  • Project Planning
  • Design Review
  • Climate Change
13 6/1/2018 12/1/2022 Khyber Pakhtunkhwa Water Resources Development Project (ADB TA 9442 PAK) Feasibility Studies of: (a) Mulkoh Irrigation Scheme (b) Remodelling of Pehur Main Canal IDS and CAD (c) Raising of Tanda Dam and Rehabilitation of IDS and CAD Asian Development Bank KPK, Pakistan US$ 110 Million US$ 720,000
  • Feasibility Study
  • Project Planning
  • Design Review
  • Climate Change
  • Condition Surveys
11 8/1/2010 6/1/2011 2 MW Hydropower Project on BRBD at RD0+000 Tarakai Energy (Pvt.) Limited Bambanwala, Dist Sialkot Punjab, Pakistan US$ 14.1 million US $ 31,430
  • Feasibility Study
15 12/1/2011 6/1/2024 Detail Design and Construction Supervision for the Remodelling of WARSAK canal KPK Irrigation and Power Department Peshawar and Nowshera District, Pakistan US$ 157 million US$ 415,000
  • Design / Detailed Design
  • Tender Documents
  • Construction Supervision
  • Design Review
  • Condition Surveys
17 8/1/2014 9/1/2016 Khyber Pakhtunkhwa Water Resources Sector Project (TA 8488 PAK) Updating Feasibility Studies of (a) Pehur High Level Canal Extension Project (b) Chapra Dam Project (c) Chamak Mira Dam Project Asian Development Bank KPK, Pakistan US$ 250 Million US$ 687,400
18 10/1/2013 6/1/2014 Identification of Hydropower Potential in Punjab World Bank (Technical Assistance) Punjab US$ 1500 million US$ 48,790
  • Project Planning
24 8/1/2010 6/1/2011 2 MW Hydropower Project on BRBD at RD0+000 Tarakai Energy (Pvt.) Limited Bambanwala, Dist Sialkot Punjab, Pakistan US$ 14.1 million US $ 31,430
  • Feasibility Study
31 1/1/2006 9/1/2006 Punjab Irrigated Agriculture Investment Program including feasibility study for rehabilitation of Balloki Barrage and Lower Bari Doab Canal System. Asian Development Bank, Manila Punjab, Pakistan US $ 235.9 million US $ 67,500
  • Feasibility Study
  • Design / Detailed Design
  • Design Review
32 1/1/2006 9/1/2006 Punjab Irrigated Agriculture Investment Program including feasibility study for rehabilitation of Balloki Barrage and Lower Bari Doab Canal System. Asian Development Bank, Manila Punjab, Pakistan US $ 235.9 million US $ 67,500
34 1/1/2006 6/1/2007 Preparation of Disaster Mitigation and Preparedness Plan for Soan Valley. Pakistan Poverty Alleviation Fund District Khushab, Punjab, Pakistan US $ 2.0 million US $ 24,230
  • Feasibility Study
  • Project Planning
  • Design / Detailed Design
  • Hydraulic Survey
33 11/1/2010 12/1/2011 Hydrological and Hydraulic Design Services for Damaged Bridges in KPK in 2010 Floods DFID through Halcrow Pakistan Khyber Pakhtunkhwa, Pakistan N.A US $ 29,020
  • Design / Detailed Design
  • Construction Supervision
  • Hydraulic Survey