Project Type( Dam / Hydropower )

Project CodeStart and Complete DateProject NameClientLocationProject CostFeeServicesFurther DetailsGallery
11 8/1/2010 6/1/2011 2 MW Hydropower Project on BRBD at RD0+000 Tarakai Energy (Pvt.) Limited Bambanwala, Dist Sialkot Punjab, Pakistan US$ 14.1 million US $ 31,430
  • Feasibility Study
14 8/1/2014 9/1/2016 Khyber Pakhtunkhwa Water Resources Sector Project (TA 8488 PAK) Updating Feasibility Studies of (a) Pehur High Level Canal Extension Project (b) Chapra Dam Project (c)Chamak Mira Dam Project Asian Development Bank KPK, Pakistan US$ 250 Million US$ 687,400
  • Feasibility Study
  • Project Planning
  • Design Review
  • Climate Change
10 8/1/2010 6/1/2011 Pre-Feasibility Studies for 2.76MW HPP On BRBD Canal at RD 433+768 3.14MW HPP on BRBD Canal at RD 509+712 2.4MW HPP on LCCL Canal within reach RD 140+060 to RD182+960 Tarakai Energy (Pvt.) Limited Punjab, Pakistan US$ 41.3 million US $ 6500
  • Feasibility Study
13 6/1/2018 12/1/2022 Khyber Pakhtunkhwa Water Resources Development Project (ADB TA 9442 PAK) Feasibility Studies of: (a) Mulkoh Irrigation Scheme (b) Remodelling of Pehur Main Canal IDS and CAD (c) Raising of Tanda Dam and Rehabilitation of IDS and CAD Asian Development Bank KPK, Pakistan US$ 110 Million US$ 720,000
  • Feasibility Study
  • Project Planning
  • Design Review
  • Climate Change
  • Condition Surveys
16 3/1/2015 3/1/2016 Pothohar Climate Smart Irrigate Agriculture Development Project Assignment A Punjab Irrigation Department, World Bank Punjab US$ 750 Million US$ 147,700
  • Feasibility Study
  • Climate Change
19 7/1/2012 12/1/2012 Fourth Periodic Inspection of Simly Dam DSO, WAPDA Simly Dam, Pakistan N.A. US$ 8,260
  • Construction Supervision
  • Periodic Inspection
20 9/1/2011 4/1/2013 870MW Suki Kinari Hydro Power Project Preparation of Project Planning Report and EPC Tender Documents SK Hydro Kaghan Valley, Pakistan US$ 2100 million US$ 182,350
  • Feasibility Study
  • Project Planning
  • Design / Detailed Design
  • Tender Documents
  • Design Review
21 1/1/2011 6/1/2011 Fifth Periodic Inspection of Chashma Barrage DSO, WAPDA Chashma, Pakistan N.A. US$ 8,390
  • Construction Supervision
  • Periodic Inspection
26 5/1/2009 5/1/2010 Restructuring of Akra Kaur Dam Balochistan Public Health Engineering Department through OSTKR Consultants Quetta Gwadar, Balochistan, Pakistan N.A US $ 20,990
  • Design / Detailed Design
  • Hydraulic Survey
  • Condition Surveys
27 4/1/2009 5/1/2010 Pre-bid Services for Daraban Zam Dam Pre-bid Services for Daraban Zam Dam NWFP, Pakistan US $ 24.81 Million US $ 26,060
  • Project Planning
  • Tender Documents
28 3/1/2008 2/1/2009 Review and Updating of Feasibility Study of 44 MW Hydropower Plant at Tail of C.J. Link Canal. H K Consortium Fortress Stadium, Lahore Punjab, Pakistan US $ 71.50 million US $ 31,780
  • Feasibility Study
29 9/1/2007 10/1/2007 Pre Tender Services for Winder Dam Saadullah Khan Brothers, 10- A/3 Gulberg III, Lahore Balochistan, Pakistan US $ 19.73 million US $ 7,230
  • Project Planning
  • Tender Documents
30 8/1/2007 6/1/2009 Detailed Design of Rehabilitation Works of Islam Barrage Irrigation and Power Department, Lahore Punjab, Pakistan US $ 24.68 million US $ 34,060
  • Design / Detailed Design
31 1/1/2006 9/1/2006 Punjab Irrigated Agriculture Investment Program including feasibility study for rehabilitation of Balloki Barrage and Lower Bari Doab Canal System. Asian Development Bank, Manila Punjab, Pakistan US $ 235.9 million US $ 67,500
  • Feasibility Study
  • Design / Detailed Design
  • Design Review
25 12/1/2009 1/1/2010 4th Periodic Inspection of Hub Dam Balochistan Dam Safety Organization WAPDA, Sunny View, Lahore Balochistan, Pakistan N.A US $ 5,470
  • Condition Surveys
  • Periodic Inspection
  • Construction Supervision
17 8/1/2014 9/1/2016 Khyber Pakhtunkhwa Water Resources Sector Project (TA 8488 PAK) Updating Feasibility Studies of (a) Pehur High Level Canal Extension Project (b) Chapra Dam Project (c) Chamak Mira Dam Project Asian Development Bank KPK, Pakistan US$ 250 Million US$ 687,400
18 10/1/2013 6/1/2014 Identification of Hydropower Potential in Punjab World Bank (Technical Assistance) Punjab US$ 1500 million US$ 48,790
  • Project Planning
22 9/1/2010 10/1/2010 Pre-bid Services for Two Hydropower Projects on UCC Etimaad Engineering (EPC/Turnkey Contractors) Punjab, Pakistan N.A US $ 4,640
  • Project Planning
  • Tender Documents
23 8/1/2010 6/1/2011 Pre-Feasibility Studies for 2.76MW HPP On BRBD Canal at RD 433+768 3.14MW HPP on BRBD Canal at RD 509+712 2.4MW HPP on LCCL Canal within reach RD 140+060 to RD182+960 Tarakai Energy (Pvt.) Limited Punjab, Pakistan US$ 41.3 million US $ 6500
  • Feasibility Study
24 8/1/2010 6/1/2011 2 MW Hydropower Project on BRBD at RD0+000 Tarakai Energy (Pvt.) Limited Bambanwala, Dist Sialkot Punjab, Pakistan US$ 14.1 million US $ 31,430
  • Feasibility Study
32 1/1/2006 9/1/2006 Punjab Irrigated Agriculture Investment Program including feasibility study for rehabilitation of Balloki Barrage and Lower Bari Doab Canal System. Asian Development Bank, Manila Punjab, Pakistan US $ 235.9 million US $ 67,500