2 2/1/2022 12/1/202 Development of additional connecting road between US Apparell Unit 3 to Kalamkar Road along with stormwater drain and pumping station Sub-Consultant to Kashif Aslam & Associates Punjab, Pakistan To be Estimated US$ 1,300
  • Project Planning
  • Design / Detailed Design
3 6/1/2022 10/1/2022 Hubco Thar Energy Limited Coal Fired Power Plant Detail Design and construction drawings for storm water drain and rainwater disposal arrangement Berkeley Associates Thar, Pakistan To be Estimated US$6,400
  • Project Planning
  • Design / Detailed Design
4 6/1/2022 10/1/2022 Hubco Thal Nova Coal Fired Power Plant Detail Design and construction drawings for storm water drain and rainwater disposal arrangement for Berkeley Associates Thar, Pakistan To be Estimated US$4,000
  • Feasibility Study
  • Project Planning
  • Design / Detailed Design
5 12/1/2021 9/1/2022 Infrastructure Development for Multan Industrial Estate Commercial Area 2 Kashif Aslam & Associates; Punjab Industrial Estate Development Management Company Punjab, Pakistan To be Estimated US$8,000