Project Code | Start and Complete Date | Project Name | Client | Location | Project Cost | Fee | Services | Further Details | Gallery |
11 |
8/1/2010 6/1/2011 |
2 MW Hydropower Project on BRBD at RD0+000 |
Tarakai Energy (Pvt.) Limited |
Bambanwala, Dist Sialkot Punjab, Pakistan |
US$ 14.1 million |
US $ 31,430 |
| | |
14 |
8/1/2014 9/1/2016 |
Khyber Pakhtunkhwa Water Resources Sector Project (TA 8488 PAK) Updating Feasibility Studies of (a) Pehur High Level Canal Extension Project (b) Chapra Dam Project (c)Chamak Mira Dam Project |
Asian Development Bank |
KPK, Pakistan |
US$ 250 Million |
US$ 687,400 |
| | |
10 |
8/1/2010 6/1/2011 |
Pre-Feasibility Studies for 2.76MW HPP On BRBD Canal at RD 433+768 3.14MW HPP on BRBD Canal at RD 509+712 2.4MW HPP on LCCL Canal within reach RD 140+060 to RD182+960 |
Tarakai Energy (Pvt.) Limited |
Punjab, Pakistan |
US$ 41.3 million |
US $ 6500 |
| | |
13 |
6/1/2018 12/1/2022 |
Khyber Pakhtunkhwa Water Resources Development Project (ADB TA 9442 PAK) Feasibility Studies of: (a) Mulkoh Irrigation Scheme (b) Remodelling of Pehur Main Canal IDS and CAD (c) Raising of Tanda Dam and Rehabilitation of IDS and CAD |
Asian Development Bank |
KPK, Pakistan |
US$ 110 Million |
US$ 720,000 |
| | |
16 |
3/1/2015 3/1/2016 |
Pothohar Climate Smart Irrigate Agriculture Development Project Assignment A |
Punjab Irrigation Department, World Bank |
Punjab |
US$ 750 Million |
US$ 147,700 |
| | |
19 |
7/1/2012 12/1/2012 |
Fourth Periodic Inspection of Simly Dam |
DSO, WAPDA |
Simly Dam, Pakistan |
N.A. |
US$ 8,260 |
| | |
20 |
9/1/2011 4/1/2013 |
870MW Suki Kinari Hydro Power Project Preparation of Project Planning Report and EPC Tender Documents |
SK Hydro |
Kaghan Valley, Pakistan |
US$ 2100 million |
US$ 182,350 |
| | |
21 |
1/1/2011 6/1/2011 |
Fifth Periodic Inspection of Chashma Barrage |
DSO, WAPDA |
Chashma, Pakistan |
N.A. |
US$ 8,390 |
| | |
26 |
5/1/2009 5/1/2010 |
Restructuring of Akra Kaur Dam Balochistan |
Public Health Engineering Department through OSTKR Consultants Quetta |
Gwadar, Balochistan, Pakistan |
N.A |
US $ 20,990 |
| | |
27 |
4/1/2009 5/1/2010 |
Pre-bid Services for Daraban Zam Dam |
Pre-bid Services for Daraban Zam Dam |
NWFP, Pakistan |
US $ 24.81 Million |
US $ 26,060 |
| | |
28 |
3/1/2008 2/1/2009 |
Review and Updating of Feasibility Study of 44 MW Hydropower Plant at Tail of C.J. Link Canal. |
H K Consortium Fortress Stadium, Lahore |
Punjab, Pakistan |
US $ 71.50 million |
US $ 31,780 |
| | |
29 |
9/1/2007 10/1/2007 |
Pre Tender Services for Winder Dam |
Saadullah Khan Brothers, 10- A/3 Gulberg III, Lahore |
Balochistan, Pakistan |
US $ 19.73 million |
US $ 7,230 |
| | |
30 |
8/1/2007 6/1/2009 |
Detailed Design of Rehabilitation Works of Islam Barrage |
Irrigation and Power Department, Lahore |
Punjab, Pakistan |
US $ 24.68 million |
US $ 34,060 |
| | |
31 |
1/1/2006 9/1/2006 |
Punjab Irrigated Agriculture Investment Program including feasibility study for rehabilitation of Balloki Barrage and Lower Bari Doab Canal System. |
Asian Development Bank, Manila |
Punjab, Pakistan |
US $ 235.9 million |
US $ 67,500 |
| | |
25 |
12/1/2009 1/1/2010 |
4th Periodic Inspection of Hub Dam Balochistan |
Dam Safety Organization WAPDA, Sunny View, Lahore |
Balochistan, Pakistan |
N.A |
US $ 5,470 |
| | |
17 |
8/1/2014 9/1/2016 |
Khyber Pakhtunkhwa Water Resources Sector Project (TA 8488 PAK) Updating Feasibility Studies of (a) Pehur High Level Canal Extension Project (b) Chapra Dam Project (c) Chamak Mira Dam Project |
Asian Development Bank |
KPK, Pakistan |
US$ 250 Million |
US$ 687,400 |
| | |
18 |
10/1/2013 6/1/2014 |
Identification of Hydropower Potential in Punjab |
World Bank (Technical Assistance) |
Punjab |
US$ 1500 million |
US$ 48,790 |
| | |
22 |
9/1/2010 10/1/2010 |
Pre-bid Services for Two Hydropower Projects on UCC |
Etimaad Engineering (EPC/Turnkey Contractors) |
Punjab, Pakistan |
N.A |
US $ 4,640 |
| | |
23 |
8/1/2010 6/1/2011 |
Pre-Feasibility Studies for 2.76MW HPP On BRBD Canal at RD 433+768 3.14MW HPP on BRBD Canal at RD 509+712 2.4MW HPP on LCCL Canal within reach RD 140+060 to RD182+960 |
Tarakai Energy (Pvt.) Limited |
Punjab, Pakistan |
US$ 41.3 million |
US $ 6500 |
| | |
24 |
8/1/2010 6/1/2011 |
2 MW Hydropower Project on BRBD at RD0+000 |
Tarakai Energy (Pvt.) Limited |
Bambanwala, Dist Sialkot Punjab, Pakistan |
US$ 14.1 million |
US $ 31,430 |
| | |
32 |
1/1/2006 9/1/2006 |
Punjab Irrigated Agriculture Investment Program including feasibility study for rehabilitation of Balloki Barrage and Lower Bari Doab Canal System. |
Asian Development Bank, Manila |
Punjab, Pakistan |
US $ 235.9 million |
US $ 67,500 |
| | |